Fermi America Project Matador
Fermi America
Planned · AI campus · AI-focused
Grid power11.0 GW
IT load8.80 GW
Blackwell-equiv.5.28M
Reported figure: 11,000 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Amarillo, TX, United States |
|---|---|
| Region | North America |
| Notes | $300B private-grid concept; initial 1 GW phase targeted first |
| Last checked | 2026-11-21 |
Sources
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| TeraWulf Abernathy JV | Abernathy, TX | 210 MW |
| IREN Childress | Childress, TX | 750 MW |
| Galaxy Helios | Dickens County, TX | 800 MW |
| Cipher Barber Lake | Colorado City, TX | 375 MW |
| IREN Sweetwater | Sweetwater, TX | 2.00 GW |
| IREN Oklahoma | Alva, OK | 1.60 GW |