IREN Childress
IREN
Operating · AI campus · AI-focused
Grid power750 MW
IT load600 MW
Blackwell-equiv.360k
Reported figure: 750 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Childress, TX, United States |
|---|---|
| Region | North America |
| Notes | 576 acres; hosts Microsoft GPU contract |
| Last checked | 2026-11-21 |
Sources
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| Galaxy Helios | Dickens County, TX | 800 MW |
| Fermi America Project Matador | Amarillo, TX | 11.0 GW |
| TeraWulf Abernathy JV | Abernathy, TX | 210 MW |
| Stargate Shackelford County (Vantage Frontier) | Shackelford County, TX | 1.40 GW |
| IREN Sweetwater | Sweetwater, TX | 2.00 GW |
| Stargate Abilene (Crusoe / Oracle) | Abilene, TX | 1.20 GW |