Galaxy Helios
Galaxy Digital · CoreWeave
Operating · AI campus · AI-focused
Grid power800 MW
IT load640 MW
Live IT today (est.)133 MW
Blackwell-equiv.384k
Reported figure: 800 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Dickens County, TX, United States |
|---|---|
| Region | North America |
| Notes | 800 MW gross = 526 MW critical IT for CoreWeave; phase I (133 MW IT) delivered; 1.63 GW site |
| Last checked | 2026-11-21 |
Sources
The Block — Galaxy delivers 133 MW to CoreWeavehttps://www.theblock.co/post/407396/galaxy-delivers-133-mw-of-critical-it-load-to-coreweave-as-helios-bitcoin-mine-turns-ai-hubData Center Knowledge — Galaxy's 1.63 GW Helioshttps://www.datacenterknowledge.com/data-center-construction/galaxy-bets-its-data-center-edge-on-power-not-bragawatts-
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| TeraWulf Abernathy JV | Abernathy, TX | 210 MW |
| IREN Childress | Childress, TX | 750 MW |
| IREN Sweetwater | Sweetwater, TX | 2.00 GW |
| Cipher Barber Lake | Colorado City, TX | 375 MW |
| Stargate Abilene (Crusoe / Oracle) | Abilene, TX | 1.20 GW |
| Stargate Shackelford County (Vantage Frontier) | Shackelford County, TX | 1.40 GW |