Cipher Barber Lake
Cipher Mining · AWS
Under construction · AI campus · AI-focused
Grid power375 MW
IT load300 MW
Blackwell-equiv.180k
Reported figure: 300 MW as IT / critical load. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Colorado City, TX, United States |
|---|---|
| Region | North America |
| Notes | 300 MW lease to AWS |
| Last checked | 2026-11-21 |
Sources
Compiled from public reporting; not yet individually verified.