IREN Sweetwater
IREN
Under construction · AI campus · AI-focused
Grid power2.00 GW
IT load1.60 GW
Blackwell-equiv.960k
Reported figure: 2,000 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Sweetwater, TX, United States |
|---|---|
| Region | North America |
| Notes | 2 GW campus; flagship for NVIDIA DSX AI factory design |
| Last checked | 2026-11-21 |
Sources
IREN — Sweetwaterhttps://www.iren.com/data-centers/sweetwaterData Center Frontier — NVIDIA and IREN target 5 GWhttps://www.datacenterfrontier.com/machine-learning/news/55377695/land-and-expand-nvidia-iren-coatue-microsoft-switch-cerebras-core-scientific
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| Cipher Barber Lake | Colorado City, TX | 375 MW |
| Stargate Abilene (Crusoe / Oracle) | Abilene, TX | 1.20 GW |
| Stargate Shackelford County (Vantage Frontier) | Shackelford County, TX | 1.40 GW |
| Galaxy Helios | Dickens County, TX | 800 MW |
| IREN Childress | Childress, TX | 750 MW |
| TeraWulf Abernathy JV | Abernathy, TX | 210 MW |