IREN Oklahoma
IREN
Planned · AI campus · AI-focused
Grid power1.60 GW
IT load1.28 GW
Blackwell-equiv.768k
Reported figure: 1,600 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Alva, OK, United States |
|---|---|
| Region | North America |
| Notes | 2,000 acres |
| Last checked | 2026-11-21 |
Sources
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| IREN Childress | Childress, TX | 750 MW |
| Fermi America Project Matador | Amarillo, TX | 11.0 GW |
| Google Mayes County (Pryor) | Pryor, OK | 442 MW |
| Galaxy Helios | Dickens County, TX | 800 MW |
| Core Scientific Denton | Denton, TX | 325 MW |
| Meta Fort Worth | Fort Worth, TX | — |