DC AtlasOpen the interactive map →
DC Atlas / United States

Poolside Project Horizon

Poolside · CoreWeave
Planned · AI campus · AI-focused
Grid power2.00 GW
IT load1.60 GW
Blackwell-equiv.960k

Reported figure: 2,000 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇺🇸 West Texas, United States
RegionNorth America
Notes2 GW behind-the-meter gas campus
Last checked2026-11-21
See it on the map →

Sources

Compiled from public reporting; not yet individually verified.

Nearby in United States

FacilityLocationGrid power
Cipher Barber LakeColorado City, TX375 MW
Meta El PasoEl Paso, TX1.00 GW
TeraWulf Abernathy JVAbernathy, TX210 MW
Stargate Doña Ana CountyDoña Ana County, NM2.20 GW
IREN SweetwaterSweetwater, TX2.00 GW
Galaxy HeliosDickens County, TX800 MW