Stargate Doña Ana County
OpenAI · Oracle
Under construction · AI campus · AI-focused
Grid power2.20 GW
IT load1.76 GW
Blackwell-equiv.1.06M
Reported figure: 2,200 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Doña Ana County, NM, United States |
|---|---|
| Region | North America |
| Notes | On-site gas; projected completion Q4 2028 |
| Last checked | 2026-11-21 |
Sources
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| Meta El Paso | El Paso, TX | 1.00 GW |
| Meta Los Lunas | Los Lunas, NM | — |
| Poolside Project Horizon | West Texas | 2.00 GW |
| TeraWulf Abernathy JV | Abernathy, TX | 210 MW |
| Aligned Phoenix | Phoenix, AZ | — |
| Iron Mountain Phoenix | Phoenix, AZ | — |