Black Hills Energy · Tallgrass · undisclosed tenant
Planned · AI campus · AI-focused
Grid power1.80 GW
IT load1.44 GW
Blackwell-equiv.864k

Reported figure: 1,800 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇺🇸 Laramie County, WY, United States
RegionNorth America
Notes1.8 GW campus fed by 2.7 GW Tallgrass gas hub; Crusoe exited Jun 2026
Last checked2026-11-21
See it on the map →

Sources

Enverus — Crusoe out of Project Jade (Jun 2026)https://www.enverus.com/blog/jade-without-the-builder-crusoe-out-on-wyomings-1-8-gw-project/POWER — Wyoming approves Project Jadehttps://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/

Nearby in United States

FacilityLocationGrid power
Meta Los LunasLos Lunas, NM—
Fermi America Project MatadorAmarillo, TX11.0 GW
Meta Eagle MountainEagle Mountain, UT—
IREN OklahomaAlva, OK1.60 GW
TeraWulf Abernathy JVAbernathy, TX210 MW
Applied Digital Polaris Forge 1Ellendale, ND500 MW