Project Jade (Cheyenne)
Black Hills Energy · Tallgrass · undisclosed tenant
Planned · AI campus · AI-focused
Grid power1.80 GW
IT load1.44 GW
Blackwell-equiv.864k
Reported figure: 1,800 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Laramie County, WY, United States |
|---|---|
| Region | North America |
| Notes | 1.8 GW campus fed by 2.7 GW Tallgrass gas hub; Crusoe exited Jun 2026 |
| Last checked | 2026-11-21 |
Sources
Enverus — Crusoe out of Project Jade (Jun 2026)https://www.enverus.com/blog/jade-without-the-builder-crusoe-out-on-wyomings-1-8-gw-project/POWER — Wyoming approves Project Jadehttps://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| Meta Los Lunas | Los Lunas, NM | — |
| Fermi America Project Matador | Amarillo, TX | 11.0 GW |
| Meta Eagle Mountain | Eagle Mountain, UT | — |
| IREN Oklahoma | Alva, OK | 1.60 GW |
| TeraWulf Abernathy JV | Abernathy, TX | 210 MW |
| Applied Digital Polaris Forge 1 | Ellendale, ND | 500 MW |