DC AtlasOpen the interactive map →
DC Atlas / Malaysia

YTL Green Data Center Park

YTL · NVIDIA
Operating · AI campus · AI-focused
Grid power1.20 GW
IT load960 MW
Live IT today (est.)100 MW
Blackwell-equiv.576k

Reported figure: 1,200 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇲🇾 Kulai, Johor, Malaysia
RegionAsia Pacific
NotesNVIDIA GB200 cluster live Oct 2025; park plan doubled from 600 MW to 1.2 GW (Jun 2026)
Last checked2026-11-21
See it on the map →

Sources

NST — Kulai campus doubles to 1.2 GW (Jun 2026)https://www.nst.com.my/amp/business/corporate/2026/06/1472220/ytl-power-speeds-data-centre-expansion-kulai-campus-doubles-12gwEpoch AI — YTL Johorhttps://epoch.ai/data/ai-data-centers/directory/ytl-johor

Nearby in Malaysia

FacilityLocationGrid power
Princeton Digital JH1Johor—
Bridge DC JohorJohor—
Yondr JohorJohor420 MW
AirTrunk JHB1Johor210 MW
DayOne NusajayaIskandar Puteri, Johor662 MW
Equinix JH1Johor—