DayOne Nusajaya
DayOne
Operating · Colocation · AI-focused
Grid power662 MW
IT load473 MW
Live IT today (est.)473 MW
Blackwell-equiv.284k
Reported figure: 473 MW as IT / critical load. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇲🇾 Iskandar Puteri, Johor, Malaysia |
|---|---|
| Region | Asia Pacific |
| Notes | Epoch est. ~473 MW IT |
| Last checked | 2026-11-21 |
Sources
Nearby in Malaysia
| Facility | Location | Grid power |
|---|---|---|
| Bridge DC Johor | Johor | — |
| AirTrunk JHB1 | Johor | 210 MW |
| Princeton Digital JH1 | Johor | — |
| Equinix JH1 | Johor | — |
| Yondr Johor | Johor | 420 MW |
| YTL Green Data Center Park | Kulai, Johor | 1.20 GW |