Virtus Wustermark
Virtus (STT GDC)
Under construction · Colocation
Grid power420 MW
IT load300 MW
Blackwell-equiv.180k
Reported figure: 300 MW as IT / critical load. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇩🇪 Wustermark, Berlin, Germany |
|---|---|
| Region | Europe |
| Notes | 300 MW campus planned; construction began 2023 (first 204 MW) |
| Last checked | 2026-11-21 |
Sources
Nearby in Germany
| Facility | Location | Grid power |
|---|---|---|
| AWS Brandenburg | Brandenburg | — |
| Schwarz Group Lübbenau | Lübbenau, Brandenburg | 200 MW |
| Schwarz Group Rostock | Rostock-Dummersdorf | 240 MW |
| Telekom Industrial AI Cloud | Munich | — |
| Google Hanau | Hanau | — |
| Vantage Offenbach | Offenbach | — |