DC AtlasOpen the interactive map →
DC Atlas / Germany

Virtus Wustermark

Virtus (STT GDC)
Under construction · Colocation
Grid power420 MW
IT load300 MW
Blackwell-equiv.180k

Reported figure: 300 MW as IT / critical load. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇩🇪 Wustermark, Berlin, Germany
RegionEurope
Notes300 MW campus planned; construction began 2023 (first 204 MW)
Last checked2026-11-21
See it on the map →

Sources

DCD — Wustermarkhttps://www.datacenterdynamics.com/en/tags/wustermark/