Schwarz Group Lübbenau
Schwarz Digits
Under construction · Telco / sovereign · AI-focused
Grid power200 MW
IT load133 MW
Blackwell-equiv.80k
Reported figure: 200 MW as grid / total power. Converted with PUE 1.50 (telco / sovereign data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇩🇪 Lübbenau, Brandenburg, Germany |
|---|---|
| Region | Europe |
| Notes | €11B; up to 200 MW grid connection; ground broken Nov 2025, due end-2027 |
| Last checked | 2026-11-21 |
Sources
JLL — Germany data centre markethttps://www.jll.com/de-de/insights/die-neue-geografie-des-deutschen-rechenzentrumsmarktesData Center Map — STACKIT Lübbenauhttps://www.datacentermap.com/germany/lubbenau/stackit-lubbenau/
Nearby in Germany
| Facility | Location | Grid power |
|---|---|---|
| AWS Brandenburg | Brandenburg | — |
| Virtus Wustermark | Wustermark, Berlin | 420 MW |
| Schwarz Group Rostock | Rostock-Dummersdorf | 240 MW |
| Telekom Industrial AI Cloud | Munich | — |
| Google Hanau | Hanau | — |
| Vantage Offenbach | Offenbach | — |