Schwarz Group Rostock
Schwarz Digits
Planned · Telco / sovereign · AI-focused
Grid power240 MW
IT load160 MW
Blackwell-equiv.96k
Reported figure: 240 MW as grid / total power. Converted with PUE 1.50 (telco / sovereign data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇩🇪 Rostock-Dummersdorf, Germany |
|---|---|
| Region | Europe |
| Notes | €5.6B; 240 MW by 2033, up to 1 GW by 2045 |
| Last checked | 2026-11-21 |
Sources
Nearby in Germany
| Facility | Location | Grid power |
|---|---|---|
| Virtus Wustermark | Wustermark, Berlin | 420 MW |
| AWS Brandenburg | Brandenburg | — |
| Schwarz Group Lübbenau | Lübbenau, Brandenburg | 200 MW |
| Google Hanau | Hanau | — |
| Vantage Offenbach | Offenbach | — |
| Equinix Frankfurt FR8 | Frankfurt | — |