Stargate Milam County (SB Energy)
OpenAI · SoftBank
Under construction · AI campus · AI-focused
Grid power1.20 GW
IT load960 MW
Blackwell-equiv.576k
Reported figure: 1,200 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Milam County, TX, United States |
|---|---|
| Region | North America |
| Notes | SoftBank-owned hardware; projected Q4 2028 |
| Last checked | 2026-11-21 |
Sources
Epoch AI — OpenAI Stargate: where the US sites stand (Apr 2026)https://epoch.ai/publications/openai-stargate-where-the-us-sites-standOpenAI — Five new Stargate sites (Sep 2025)https://openai.com/index/five-new-stargate-sites/
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| CloudBurst Central Texas | San Marcos, TX | 1.20 GW |
| Google Midlothian | Midlothian, TX | 124 MW |
| Microsoft San Antonio | San Antonio, TX | — |
| Digital Realty Richardson | Richardson, TX | — |
| Meta Fort Worth | Fort Worth, TX | — |
| CoreWeave Plano | Plano, TX | — |