CloudBurst Central Texas

CloudBurst Data Centers
Under construction · AI campus · AI-focused
Grid power1.20 GW
IT load960 MW
Blackwell-equiv.576k

Reported figure: 1,200 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇺🇸 San Marcos, TX, United States
RegionNorth America
NotesThree 400 MW phases
Last checked2026-11-21
See it on the map →

Sources

US Data Center Map: 2026 Project Trackerhttps://www.apollotechnical.com/?p=58960