SoftBank Hokkaido Tomakomai AI DC
SoftBank Corp.
Under construction · AI campus · AI-focused
Grid power300 MW
IT load240 MW
Blackwell-equiv.144k
Reported figure: 300 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇯🇵 Tomakomai, Hokkaido, Japan |
|---|---|
| Region | Asia Pacific |
| Notes | 50 MW at FY2026 opening; >300 MW, potential 1 GW |
| Last checked | 2026-11-21 |
Sources
SoftBank — Next-gen infrastructurehttps://cdn.softbank.jp/en/corp/sustainability/materiality/next-gen-infra/SoftBank — Inside the Tomakomai AI data centerhttps://www.softbank.jp/en/sbnews/entry/20260225_01
Nearby in Japan
| Facility | Location | Grid power |
|---|---|---|
| Sakura Internet Ishikari | Ishikari, Hokkaido | — |
| Kyocera Ishikari renewable DC | Ishikari, Hokkaido | 22 MW |
| Akita AI data center | Akita | 500 MW |
| IIJ Shirakawa DCC | Shirakawa, Fukushima | — |
| Goodman Tsukuba (TY005) | Tsukuba, Ibaraki | 1.00 GW |
| Colt DCS Inzai | Inzai, Chiba | 70 MW |