Kyocera Ishikari renewable DC
Kyocera Communication Systems
Under construction ยท Telco / sovereign
Grid power22 MW
IT load15 MW
Blackwell-equiv.9k
Reported figure: 15 MW as IT / critical load. Converted with PUE 1.50 (telco / sovereign data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | ๐ฏ๐ต Ishikari, Hokkaido, Japan |
|---|---|
| Region | Asia Pacific |
| Notes | 100% renewable; Q1 2026 |
| Last checked | 2026-11-21 |
Sources
Nearby in Japan
| Facility | Location | Grid power |
|---|---|---|
| Sakura Internet Ishikari | Ishikari, Hokkaido | โ |
| SoftBank Hokkaido Tomakomai AI DC | Tomakomai, Hokkaido | 300 MW |
| Akita AI data center | Akita | 500 MW |
| IIJ Shirakawa DCC | Shirakawa, Fukushima | โ |
| Goodman Tsukuba (TY005) | Tsukuba, Ibaraki | 1.00 GW |
| Colt DCS Inzai | Inzai, Chiba | 70 MW |