QTS Cambois
QTS (Blackstone)
Planned · Colocation · AI-focused
Grid power720 MW
IT load514 MW
Blackwell-equiv.309k
Reported figure: 720 MW as grid / total power. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇬🇧 Blyth, Northumberland, United Kingdom |
|---|---|
| Region | Europe |
| Notes | 720 MW; outline planning approved; North East AI Growth Zone |
| Last checked | 2026-11-21 |
Sources
Blackridge Research — Upcoming UK data centershttps://www.blackridgeresearch.com/blog/top-latest-list-of-upcoming-data-centers-in-the-uk-united-kingdomQTS — Cambois campushttps://qtsdatacenters.com/?p=2323
Nearby in United Kingdom
| Facility | Location | Grid power |
|---|---|---|
| Stargate UK Cobalt Park | North Tyneside | — |
| Elsham Tech Park | Elsham, Lincolnshire | 1.00 GW |
| Virtus London campus | Slough / Hayes | — |
| Kao Data Harlow | Harlow, Essex | — |
| Equinix Slough campus (LD4–LD6) | Slough | — |
| Google Waltham Cross | Waltham Cross, Herts | — |