Elsham Tech Park
Elsham Tech Park Ltd
Planned · AI campus · AI-focused
Grid power1.00 GW
IT load800 MW
Blackwell-equiv.480k
Reported figure: 1,000 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇬🇧 Elsham, Lincolnshire, United Kingdom |
|---|---|
| Region | Europe |
| Notes | 1 GW; planning submitted 2025, construction from 2027 |
| Last checked | 2026-11-21 |
Sources
Nearby in United Kingdom
| Facility | Location | Grid power |
|---|---|---|
| Stargate UK Cobalt Park | North Tyneside | — |
| Kao Data Harlow | Harlow, Essex | — |
| QTS Cambois | Blyth, Northumberland | 720 MW |
| Google Waltham Cross | Waltham Cross, Herts | — |
| Nscale Loughton | Loughton, Essex | 112 MW |
| Ark Park Royal | Park Royal, London | — |