DC AtlasOpen the interactive map →
DC Atlas / United States

Google New Albany

Google
Operating · Hyperscaler · AI-focused
Grid power544 MW
IT load453 MW
Live IT today (est.)453 MW
Blackwell-equiv.272k

Reported figure: 453 MW as IT / critical load. Converted with PUE 1.20 (hyperscale data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇺🇸 New Albany, OH, United States
RegionNorth America
NotesCentral Ohio TPU cluster; Epoch est. ~453 MW IT
Last checked2026-11-21
See it on the map →

Sources

Epoch AI — AI data centers hubhttps://epoch.ai/data/ai-data-centers?tab=cost

Nearby in United States

FacilityLocationGrid power
Meta PrometheusNew Albany, OH1.00 GW
Cologix Johnstown campusJohnstown, OH800 MW
AWS Ohio (New Albany / Hilliard)Central Ohio—
Stargate LordstownLordstown, OH—
Stargate Saline TownshipSaline Township, MI1.40 GW
TeraWulf Kentucky campus (Anthropic lease)Kentucky—