DC AtlasOpen the interactive map β†’
DC Atlas / United States

Cologix Johnstown campus

Cologix
Under construction Β· Colocation
Grid power800 MW
IT load571 MW
Blackwell-equiv.343k

Reported figure: 800 MW as grid / total power. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

LocationπŸ‡ΊπŸ‡Έ Johnstown, OH, United States
RegionNorth America
NotesEight data centers, ~$7B
Last checked2026-11-21
See it on the map β†’

Sources

US Data Center Map: 2026 Project Trackerhttps://www.apollotechnical.com/?p=58960

Nearby in United States

FacilityLocationGrid power
Meta PrometheusNew Albany, OH1.00 GW
Google New AlbanyNew Albany, OH544 MW
AWS Ohio (New Albany / Hilliard)Central Ohioβ€”
Stargate LordstownLordstown, OHβ€”
Stargate Saline TownshipSaline Township, MI1.40 GW
TeraWulf Kentucky campus (Anthropic lease)Kentuckyβ€”