Applied Digital Polaris Forge 2

Applied Digital
Under construction · AI campus · AI-focused
Grid power350 MW
IT load280 MW
Blackwell-equiv.168k

Reported figure: 280 MW as IT / critical load. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇺🇸 Harwood, ND, United States
RegionNorth America
Notes280 MW campus; 200 MW leased to a hyperscaler, ROFR on 800 MW more; PUE 1.18 target
Last checked2026-11-21
See it on the map →

Sources

Capacity — Polaris Forge 2 hyperscaler leasehttps://capacityglobal.com/news/applied-digital-north-dakota-ai-factory/