Applied Digital Delta Forge 2
Applied Digital
Planned · AI campus · AI-focused
Grid power262 MW
IT load210 MW
Blackwell-equiv.126k
Reported figure: 210 MW as IT / critical load. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Brookwood, AL, United States |
|---|---|
| Region | North America |
| Notes | $3.2B, 210 MW critical IT |
| Last checked | 2026-11-21 |