Applied Digital Delta Forge 1
Applied Digital
Under construction · AI campus · AI-focused
Grid power430 MW
IT load344 MW
Blackwell-equiv.206k
Reported figure: 430 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Boyce, LA, United States |
|---|---|
| Region | North America |
| Last checked | 2026-11-21 |
Sources
Nearby in United States
| Facility | Location | Grid power |
|---|---|---|
| Meta Hyperion | Richland Parish, LA | 2.00 GW |
| AWS Madison County | Canton, MS | 1.20 GW |
| CoreWeave Plano | Plano, TX | — |
| Digital Realty Richardson | Richardson, TX | — |
| Stargate Milam County (SB Energy) | Milam County, TX | 1.20 GW |
| Aligned Plano | Plano, TX | — |