Stargate Argentina (Sur Energy)
OpenAI · Sur Energy
Planned · AI campus · AI-focused
Grid power500 MW
IT load400 MW
Blackwell-equiv.240k
Reported figure: 500 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇦🇷 Patagonia, Argentina |
|---|---|
| Region | Latin America |
| Notes | LOI Oct 2025; up to 500 MW, ~US$25B; first 100 MW phase targeted 2027 |
| Last checked | 2026-11-21 |
Sources
Converge Digest — Stargate Argentinahttps://convergedigest.com/?p=106144AI Weekly / Reuters — Patagonia AI data centershttps://aiweekly.co/alerts/hyperscalers-court-argentine-patagonia-for-ai-data-centers
Nearby in Argentina
| Facility | Location | Grid power |
|---|