SoftBank Sakai AI DC
SoftBank Corp.
Under construction · AI campus · AI-focused
Grid power140 MW
IT load112 MW
Blackwell-equiv.67k
Reported figure: 140 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇯🇵 Sakai, Osaka, Japan |
|---|---|
| Region | Asia Pacific |
| Notes | 140 MW AI DC from FY2027 on former Sharp plant; aiming >240 MW |
| Last checked | 2026-11-21 |
Sources
SoftBank — Next-gen infrastructurehttps://cdn.softbank.jp/en/corp/sustainability/materiality/next-gen-infra/TechCrunch — SoftBank buys Sharp planthttps://techcrunch.com/?p=2980525
Nearby in Japan
| Facility | Location | Grid power |
|---|---|---|
| KDDI Osaka Sakai AI DC | Sakai, Osaka | 48 MW |
| Vantage Osaka | Osaka | — |
| CyrusOne / KEPCO Osaka | Osaka | — |
| Equinix Osaka OS3 | Osaka | — |
| Equinix Osaka campus | Osaka | — |
| Microsoft Japan West | Osaka | — |