QScale Q01
QScale
Operating · Colocation · AI-focused
Grid power142 MW
IT load101 MW
Blackwell-equiv.61k
Reported figure: 142 MW as grid / total power. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇨🇦 Lévis, QC, Canada |
|---|---|
| Region | North America |
| Notes | $1.2B, 142 MW AI campus; HPE AI cloud anchor |
| Last checked | 2026-11-21 |
Sources
Nearby in Canada
| Facility | Location | Grid power |
|---|---|---|
| Vantage Québec City | Québec City, QC | — |
| eStruxture MTL-3 | Montréal, QC | — |
| Cologix Montréal campus | Montréal, QC | — |
| Telus Sovereign AI Factory | Rimouski, QC | — |
| Equinix TR2 | Toronto, ON | — |
| Microsoft Canada Central | Toronto, ON | — |