Microsoft Rhineland (Bergheim / Elsdorf)
Microsoft
Under construction · Hyperscaler
Grid power500 MW
IT load417 MW
Blackwell-equiv.250k
Reported figure: 500 MW as grid / total power. Converted with PUE 1.20 (hyperscale data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇩🇪 Bergheim, NRW, Germany |
|---|---|
| Region | Europe |
| Notes | €3.2B, three sites; ~520 MVA grid connection; ground broken 2026 |
| Last checked | 2026-11-21 |
Sources
heise — Microsoft NRW cluster 520 MWhttps://heise.de/-11216864GTAI — Groundbreaking (Apr 2026)https://www.gtai.de/en/invest/industries/digital-economy/groundbreaking-ceremony-at-microsoft-s-nrw-data-center--1990680