Homer City Energy Campus
Homer City Redevelopment · AWS (proposed)
Under construction · AI campus · AI-focused
Grid power4.40 GW
IT load3.52 GW
Blackwell-equiv.2.11M
Reported figure: 4,400 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇺🇸 Homer City, PA, United States |
|---|---|
| Region | North America |
| Notes | Former coal plant; ~4.4 GW gas generation, power from 2027 |
| Last checked | 2026-11-21 |