DC Atlas / Saudi Arabia

DataVolt Oxagon

DataVolt
Under construction · AI campus · AI-focused
Grid power1.50 GW
IT load1.20 GW
Blackwell-equiv.720k

Reported figure: 1,500 MW as grid / total power. Converted with PUE 1.25 (AI campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇸🇦 Oxagon, NEOM, Saudi Arabia
RegionMiddle East & Africa
Notes1.5 GW campus; 360 MW first phase under construction since Aug 2026 (100 MW with Humain), due 2028
Last checked2026-11-21
See it on the map →

Sources

DCD — Humain breaks ground at Oxagonhttps://datacenterdynamics.com/en/news/humain-breaks-ground-on-neoms-oxagon-data-centerNEOM — Humain & DataVolthttps://www.neom.com/en-us/newsroom/HUMAIN-and-DataVolt-to-develop-AI-data-center-in-NEOM

Nearby in Saudi Arabia

FacilityLocationGrid power
Humain RiyadhRiyadh100 MW
Humain East Riyadh AI campusEast Riyadh6.00 GW
Humain DammamDammam100 MW