CtrlS Hyderabad campus
CtrlS
Operating · Colocation · AI-focused
Grid power500 MW
IT load357 MW
Blackwell-equiv.214k
Reported figure: 500 MW as grid / total power. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇮🇳 Hyderabad, India |
|---|---|
| Region | Asia Pacific |
| Notes | AI mega campus planned up to 500 MW |
| Last checked | 2026-11-21 |