Bell AI Fabric — Kamloops (Hillside / TRU)

Bell Canada
Under construction · Telco / sovereign · AI-focused
Grid power39 MW
IT load26 MW
Blackwell-equiv.16k

Reported figure: 26 MW as IT / critical load. Converted with PUE 1.50 (telco / sovereign data center default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).

Location🇨🇦 Kamloops, BC, Canada
RegionNorth America
Notes26 MW site; Bell AI Fabric has ~400 MW committed, ≥800 MW planned
Last checked2026-11-21
See it on the map →

Sources

Bell — AI Fabric economic impacthttps://businessmarkets.bell.ca/economic-impact

Nearby in Canada

FacilityLocationGrid power
Wonder Valley AI campusGreenview, AB7.50 GW
AWS Calgary regionCalgary, AB—