AirTrunk TOK1
AirTrunk (Blackstone)
Operating · Colocation · AI-focused
Grid power420 MW
IT load300 MW
Blackwell-equiv.180k
Reported figure: 300 MW as IT / critical load. Converted with PUE 1.40 (colocation campus default); GPU equivalents assume GB200 NVL72 racks (120 kW, 72 GPUs).
| Location | 🇯🇵 Inzai, Chiba, Japan |
|---|---|
| Region | Asia Pacific |
| Notes | 300+ MW campus; opened 2021 with ~60 MW; US$1B liquid-cooling upgrade |
| Last checked | 2026-11-21 |
Sources
AirTrunk — TOK1 Tokyo Easthttps://airtrunk.com/?p=6399Spherical Insights — AirTrunk US$1B TOK1 upgradehttps://www.sphericalinsights.com/blogs/airtrunk-commits-us-1-billion-to-upgrade-japan-data-centre-for-ai-workloads